Skip to content
Dzala

Kitchen Addition

The kitchen that the original floor plan did not allow.

A bump-out or rear addition adds the square footage to support an island, a breakfast area, or a proper working kitchen.

At a glance

Lead time
3–5 weeks
Process
Designer-led
Materials
Specified materials
Service area
DC, MD, VA
Kitchen Addition by Dzala General Contractor
10+ years experience · across the DMV
Licensed & insured · certificates on request
Free estimates · itemized, in writing
In-house crews · no subcontractors on key trades

Many Northern Virginia Cape Cods and 1950s colonials have kitchens that are 10 by 12 or smaller — too small for a working island, too tight for a breakfast table, designed for a era when kitchens were not the center of the home. A rear bump-out of 8 to 12 feet transforms the usability of the space without the cost of a full addition.

Why Dzala

Kitchen additions that earn their cost

A kitchen addition is only worth the investment if it unlocks what the original footprint prevented. Dzala draws kitchen additions around the specific constraint being solved — island room, breakfast nook, better traffic flow — so the square footage added is square footage used.

  • Zoning and setback pre-check
  • Structural assessment of existing kitchen
  • Full kitchen design included
  • Permits handled by Dzala

What you get

The details that separate a Dzala project from builder-grade alternatives.

Rear bump-out or addition

From 6-foot bump to full rear addition.

New foundation as needed

Crawl-space, slab, or pier foundation for addition.

Island design and cabinetry

Full kitchen layout included.

Exterior match

Roofline and siding matched to existing home.

Reviews

Read homeowner reviews on Google.

Every Dzala review is published and updated continuously on our Google Business Profile.

Frequently asked

Questions clients ask before booking.

Cannot find what you are looking for? Send a question.

How far can I extend my kitchen into the backyard?

The answer depends on your lot's rear setback requirement. In Fairfax County, most residential lots require a 25-foot rear setback from the property line. Dzala verifies your specific setback before designing the addition.

Ready when you are

Talk through your kitchen addition project with a designer.

90 minutes in our DC showroom. Material samples on the wall, your room on the table, no quote until we draw it.

  • · No charge for the consultation
  • · No quote sent without drawings
  • · Designer-led — not sales

No pressure, no quote up front

Get a Free Estimate

On-site consultation at your property. We will review the scope, answer your questions, and provide a written estimate within five business days.

What are you considering?

Get a free estimate for your kitchen addition project

On-site consultation. Written estimate. No pressure.

Schedule